Marine - ScottishPower Renewables
machairwind marine
marine 1 wc
Marine
Supporting SPR with Marine Operations
If you are the owner of a fishing or other vessel that is under 500GT who would like to bid for any marine operations work relating to the windfarm, please note that the following minimum criteria will apply:
- Fully insured
- Experience of operations in the West of Scotland
- If over 24m a Load Line Certificate (fishing vessels shall have a Load Line exemption)
- Stability Booklet
All vessels should have a Safety Management System in place, please refer to:
- MGN 596 (F) FISHING SAFETY MANAGEMENT CODE: Helping to improve the management safety on Fishing Vessels (opens in a new window)
- MSN 1892 (M) The Workboat Code Edition 3 (opens in a new window) or the most recent edition.
Notice to Mariners
Advance notification will be given of offshore survey works associated with vessels being used for MachairWind. These notices will provide details of the location, timings and vessels involved. Further details are provided below.
offshore marine notices
2024 - Notices
- NtM Maintenance of Metocean Equipment Rev 5 | 26 March 2024 (opens in a new window)
- NtM Maintenance of Metocean Equipment Rev 6 | 4 April 2024 (opens in a new window)
- NtM Maintenance of Floating LiDAR buoy and removal of Metocean Equipment Rev 7 I 23 May 2024 (opens in a new window)
- NtM Maintenance of Floating LiDAR and Removal of Metocean Equipment Rev 8 | 13 June 2024 (opens in a new window)
- NtM Maintenance of Floating LiDAR Buoy and Installation of Temporary Marker Rev 9 I 24 October 2024 (opens in a new window)
- NtM Redeployment of Floating LiDAR Buoy and Completion of Servicing Work Rev 10 | 11 November 2024 (opens in a new window)
2023 - Notices
- NtM MachairWind Metocean Deployment Notice to Mariners | 13 March 2023 (opens in a new window)
- NtM MachairWind Metocean Deployment Notice to Mariners Rev 2 | 14 April 2023 (opens in a new window)
- NtMConfirmation of Floating LiDAR and Metocean Survey Deployment | 3 May 2023 (opens in a new window)
- NtM Maintenance of Floating LiDAR and Metocean Equipment | 10 July 2023 (opens in a new window)
- NtM Commencement of Site Investigation Works | 4 August 2023 (opens in a new window)
- NtM Maintenance of Metocean Equipment | 11 August 2023 (opens in a new window)
- NtM Maintenance of Metocean Equipment Rev 2 | 5 October 2023 (opens in a new window)
- NtM Maintenance of Metocean Equipment Rev 3 | 10 October 2023 (opens in a new window)
- NtM Maintenance of Metocean Equipment Rev 4 | 28 November 2023 (opens in a new window)
marine 2 wc
Engagement with Local Fishers
Our liaison officers – Brown and May Marine – are currently engaging with local fishers on an ongoing basis. Thus far, several fishers from Islay and Jura have pinpointed frequently used seabed areas and ports, as well as vessels operating in the project area.
This has assisted us in analysing the area to ensure continuation activity for sea users within the site. We thoroughly appreciate the cooperation of sea users and fishers within Argyll & Bute and look forward to ongoing discussions.