Non-Material Change application to East Anglia ONE

East Anglia ONE Limited (EAOL) has commenced consultation for a non-material change to its planning consent.

The change relates to a reduction in the consented number of Wind Turbine Generators (WTGs) and their associated parameters under both the Development Consent Order (DCO) and the Deemed Marine Licence (DMLs), and therefore separate applications will be made for the change to the Department for Business, Energy and Industrial Strategy (BEIS) and the Marine Management Organisation (MMO).

Proposed Changes

EAOL seeks to make a non-material change in order to reduce the maximum number of WTGs consented for the HVAC option under the DCO and DMLs to reflect the number of WTGs installed at East Anglia ONE and a number of the WTGs' parameters comprising their height (when measured from Lowest Astronomical Tide (LAT) to the tip of the vertical blade), their hub height (when measured from LAT to the centreline), their rotor diameter and their clearance height (from Mean High Water Springs (MHWS) to the lowest point of the rotating blade). No other changes to the offshore or onshore elements of the project within the DCO and/or DMLs are sought.

More detail is available in the East Anglia ONE Non-Material Change Supporting Statement, which is available to download below:

Have Your Say

The consultation will end on 25th May and feedback can be provided via:

Email: eastangliaone@scottishpower.com

Phone: 07738 063259

Should a hard copy of the application be required, please use the above details to request this.

 
Back to top

Footer