Select Language:

Halsary Windfarm

Halsary Windfarm Viewpoint

Above: Photomontage of Halsary Windfarm showing turbines 112 metres to the tip of the blade at its highest point

Infographic
Infographic

Halsary Windfarm Project Details

Location

Halsary Windfarm will be based south of Spittal Village in Caithness

Stage

Consented in September 2013, ScottishPower Renewables is currently awaiting construction

No. Turbines

15 turbines

Turbine Height

Up to a maximum of 112 metres to the tip of the blade at its highest point

Operating Capacity

Up to 34.5 megawatts

Design Considerations

Halsary Windfarm has been designed to complement the nearby consented and operational windfarms. The turbine locations are influenced by the results of extensive environmental and technical surveys.

Benefits

When operational, the tracks at Halsary Windfarm will be available for recreational use by members of the public and we are proposing a small car park, just off the A9, to make accessing these tracks even easier.

Contact

The Halsary Windfarm Project Team can be contacted directly by email.

 

 

Social Networks